The Marlboro capacity of 15 MWp was only reached in 2004, thanks to the installation of new wafer-ovens. According to the German authorities, this does not allow to conclude that Marlboro had industrial processes for the production of cells and modules, or that its output reached the necessary standards for industrial production. Moreover, as said above, the modules produced at this plant were of another type than those to be produced in Sovello1. The German authorities inform that pilot projects in the solar industry have capacities ranging between 10 and 30 MWp. They are of the opinion that the fact that the Sovello1 project is situated at the upper line of this range should not exclude this project from the qualification as a pilot project. They further inform that the capacity of the Sovello1 plant (30 MWp) was in fact determined by the capacity of the […] [The […] uses an innovative […] (instead of the traditional ‘plasma enhanced chemical vapour deposition’, PECVD process).] specifically developed for this plant.
54 5. COMMENTS FROM THE GERMAN AUTHORITIES › 5.1. Sovello1 is a pilot project, Decision_act (EU) 2009/697
In forcesince 17 Jun 2009