13 2. DETAILED DESCRIPTION OF THE AID › 2.3. Investment project, Decision_act (EU) 2009/697

In forcesince 17 Jun 2009

Sovello already operates in Thalheim its Sovello1 [Sovello already received regional investment aid for its first plant in Thalheim, including an SME bonus of 15 % on the basis of the GA scheme, which refers to Article 4(3)(b) of Commission Regulation (EC) No 70/2001 of 12 January 2001 on the application of Articles 87 and 88 of the EC Treaty to State aid to small and medium-sized enterprises (OJ L 10, 13.1.2001, p. 33). In its decision No 426/05 of 7 June 2006 (OJ C 270, 7.11.2006, p. 2) the Commission assessed that at the time of the notification Sovello was an SME.] plant that started production of solar modules in April 2006. At the date of notification, an output of 30 Megawatt peak [One Megawatt peak (MWp) corresponds to 1000000 Watt peak (Wp). Watt peak is a measurement unit for the capacity (nominal output) of solar cells and solar modules. Watt peak is the standard used in the photovoltaic industry to measure the technical capacity of solar modules; it expresses the nominal output of the module under standard test conditions.] was planned to be reached by end 2007. The German authorities claim that this plant was designed as a pilot project to validate Evergreen’s String-Ribbon technology in an industrial process, combined with the manufacturing techniques of Q-Cells.