39 3. GROUNDS FOR INITIATING THE FORMAL INVESTIGATION PROCEDURE, Decision_act (EU) 2009/697

In forcesince 17 Jun 2009

The Commission took the position that if Sovello1 could not be considered as a pilot project, then it would seem that it may have to be considered as a single investment project with Sovello2 (based on a global assessment of the criteria of point 49 of the MSF 2002). In this context the Commission concluded that, notwithstanding the arguments of the German authorities about the physical separation of the two plants, and the lack of functional links between them, the simple fact remained that there is one single company, having two production plants, built on physically adjacent land, producing the same product using the same technology, in a scenario where work begun on the second plant within three months of the start of commercial production of the first plant.