Offshore renewable energy sources, such as offshore wind, ocean energy and floating photovoltaic, will play an instrumental role in building a power system largely based on renewable energy sources and in ensuring climate neutrality by 2050. There are, however, substantial obstacles to their wider and efficient deployment preventing the massive scale up needed to achieve those objectives. Similar obstacles could arise for other offshore technologies in the future. In order to reduce investment risk for offshore project developers, instruments such as power purchase agreements (PPAs) or two-way contracts for difference could be used to facilitate the development of offshore projects. For offshore hybrid projects connected to more than one market in an offshore bidding zone, there is an additional risk associated with the unique topographical situation related to market access. To reduce the risks for such projects, transmission system operators should compensate where, in the validated capacity calculation results, they either have not made available the capacity agreed in the connection agreements on the interconnector or have not made available the capacity on the critical network elements pursuant to the capacity calculation rules laid down in Article 16(8) of Regulation (EU) 2019/943, or both. Transmission system operators should pay no compensation if, in the validated capacity calculation results, they have made available the capacity of the interconnector at or above the connection agreement requirements as well as the capacity on critical network elements in accordance with the rules laid down in Article 16(8) of Regulation (EU) 2019/943. In the respective connection agreement with the offshore renewable electricity generation plant operator, transmission system operators should strive to give the total agreed capacity as firm, not flexible, and in line with the framework for connection agreements established in Directive (EU) 2019/944. Member States should be informed sufficiently in advance about the connection agreement. Compensation should be payable either if the available transmission capacities are reduced to the extent that the full amount of electricity generation that the offshore renewable electricity generation plant would have otherwise been able to export cannot be delivered to the surrounding markets, or where, despite being able to export, there is a corresponding price decrease in the offshore bidding zone due to capacity reductions as compared to without-capacity reductions, or both. The compensation should be paid from congestion income. It should apply where one or more transmission system operators have not made sufficient capacity available to export the electricity generation capability on their respective interconnector up to the capacity agreed in the connection agreement, and should be provided by those transmission system operators. In the interest of regional fairness, if the insufficient capacity is due to other transmission system operators having not made available the capacity on their critical network elements, pursuant to the capacity calculation rules laid down in Article 16(8) of Regulation (EU) 2019/943, the costs of compensation should be shared proportionately between those transmission system operators in line with the polluter pays principle. In addition, any compensation not covered by that proportionate sharing may be divided between the relevant parties in the Member States involved in the offshore hybrid project as part of their cost sharing arrangements. That compensation should not result in overcompensation and is intended to balance the reduced revenues of offshore renewable electricity generation plant operators due to reduced access to interconnected markets. It should be related only to the production capability available to the market, which may be weather dependent and which excludes the outage and maintenance operations of the offshore project. The compensation in the case of a lack of access to the transmission network should not be interpreted as constituting priority dispatch and should be aligned with the principles of non-discrimination and maximisation of cross-border capacities for trade pursuant to Article 16(4) of Regulation (EU) 2019/943. Moreover, there should be no double-compensation for the same risk covered under that provision, for example if the risk is already covered under a contract for difference or another relevant support scheme. Details of that compensation mechanism and the methodology for the implementation to be developed including the conditions under which the measure may expire, such as the existence of sufficient demand within the offshore bidding zone, for example a large electrolyser, or direct access to a sufficient number of markets for the risk to disappear, are intended to be further elaborated in an implementing act including, where relevant, through amendments to Commission Regulation (EU) 2015/1222 [Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management (OJ L 197, 25.7.2015, p. 24).].
Recital 24, Regulation (EU) 2024/1747
In force