Recital 50, Regulation (EU) 2024/1747

In force

The connection of new generation and demand installations to the grid, in particular renewable energy plants, often faces delays in grid connection procedures. One of the reasons for such delays is the lack of available grid capacity at the location chosen by the investor, which entails a need for grid extensions or reinforcements to connect the installations to the system in a safe manner. A new requirement for electricity system operators, both at transmission and distribution levels, to publish and update information on the capacity available for new connections in their areas of operation would give investors easier access to information of grid capacity availability within the system and thereby accelerate decision-making which, in turn, would accelerate the required deployment of renewable energy. That information should be updated on a regular basis, at least every month, by transmission system operators. Transmission system operators should also publish the criteria used to determine the available grid capacities, such as existing demand and generation capacities, the assumptions made for assessing the possible further integration of additional system users, the relevant information on possible energy curtailment, and the expectation of upcoming relevant network developments.