Recital 41, Regulation (EU) 2024/1747

In force

Design principles as laid down in this Regulation should apply to direct price support schemes in the form of two-way contracts for difference or equivalent schemes with the same effects. In the assessment of such two-way contracts for difference or equivalent schemes with the same effects under State aid rules, the Commission should check compliance of those contracts or schemes with Union law which is intrinsically linked to State aid rules, such as the design principles for two-way contracts for difference or equivalent schemes with the same effects as laid down in this Regulation. The design of those two-way contracts for difference or equivalent schemes with the same effects should preserve the incentives for the power-generating facility to operate and participate efficiently in the electricity markets, in particular to reflect market circumstances. In its assessment, the Commission should ensure that the design of two-way contracts for difference or equivalent schemes with the same effects does not lead to undue distortions to competition and trade in the internal market. The Commission should, in particular, ensure that the distribution of revenues to undertakings does not distort the level playing field in the internal market in particular where no competitive bidding process can be applied. Two-way contracts for difference or equivalent schemes with the same effects could vary in duration and could include inter alia injection-based contracts for difference with one or several strike prices, a floor price, or capability or yardstick contracts for difference. The obligation to use two-way contracts for difference or equivalent schemes with the same effects does not apply to support schemes not directly linked to electricity generation, such as energy storage, and which do not use direct price support, such as investment aid in the form of upfront grants, tax measures or green certificates. To incentivise the counterparties to fulfil their contractual obligations, two-way contracts for difference or equivalent schemes with the same effects should include penalty clauses applicable in the case of undue unilateral early termination of the contract.