Strengthening the internal energy market and achieving the climate and energy transition objectives require a substantial upgrade of the Union’s electricity network to be able to host vast increases of renewable generation capacity, with weather-dependent variability in generation amounts and changing electricity flow patterns across the Union, and to be able to address new demand such as electric vehicles and heat pumps. Investment in grids, within and across borders, is crucial to the proper functioning of the internal electricity market, including security of supply. Such investment is necessary to integrate renewable energy and demand in a context where they are located further apart than in the past and, ultimately, to deliver on the Union climate and energy targets. Therefore, any reform of the Union’s electricity market should contribute to a more integrated European electricity network, with a view to ensuring that each Member State reaches a level of electricity interconnectivity in accordance with the electricity interconnection target for 2030 of at least 15 % pursuant to Article 4, point (d)(1), of Regulation (EU) 2018/1999, that that interconnection capacity is used as much as possible for cross-border trade and that the Union’s electricity network and connectivity infrastructure are built or upgraded, such as the Union projects of common interest established pursuant to Regulation (EU) 2022/869 of the European Parliament and of the Council [Regulation (EU) 2022/869 of the European Parliament and of the Council of 30 May 2022 on guidelines for trans-European energy infrastructure, amending Regulations (EC) No 715/2009, (EU) 2019/942 and (EU) 2019/943 and Directives 2009/73/EC and (EU) 2019/944, and repealing Regulation (EU) No 347/2013 (OJ L 152, 3.6.2022, p. 45).]. Adequate connectivity should be provided to all Union citizens and undertakings as this can result in major opportunities for them to participate in the energy transition and the digital transformation of the Union. Special consideration should be given to the outermost regions referred to in Article 349 of the Treaty on the Functioning of the European Union (TFEU), which recognises their specific constraints and provides for the adoption of specific measures in their regard.
Recital 7, Regulation (EU) 2024/1747
In force
- celex=32009L0073
- celex=32009R0715
- celex=32013R0347
- num:eu=2009/73