Regulation (EU) 2015/1222
Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management (Text with EEA relevance)
- 1Subject matter and scope
- 2Definitions
- 3Objectives of capacity allocation and congestion management cooperation
- 4NEMOs designation and revocation of the designation
- 5NEMOs designation in case of a national legal monopoly for trading services
- 6NEMO designation criteria
- 7NEMO tasks
- 8TSOs' tasks related to single day-ahead and intraday coupling
- 9Adoption of terms and conditions or methodologies
- 10Day-to-day management of the single day-ahead and intraday coupling
- 11Stakeholder involvement
- 12Consultation
- 13Confidentiality obligations
CHAPTER 1 Capacity calculation
Section 1 General requirements
Section 2 The common grid model
Section 3 Capacity calculation methodologies
- 20Introduction of flow-based capacity calculation methodology
- 21Capacity calculation methodology
- 22Reliability margin methodology
- 23Methodologies for operational security limits, contingencies and allocation constraints
- 24Generation shift keys methodology
- 25Methodology for remedial actions in capacity calculation
- 26Cross-zonal capacity validation methodology
Section 4 The capacity calculation process
Section 5 Biennial report on capacity calculation and allocation
CHAPTER 2 Bidding zone configuration
CHAPTER 3 Redispatching and countertrading
CHAPTER 4 Algorithm development
CHAPTER 5 Single day-ahead coupling
Section 1 The price coupling algorithm
- 38Objectives of the price coupling algorithm
- 39Inputs and results of the price coupling algorithm
- 40Products accommodated
- 41Maximum and minimum prices
- 42Pricing of day-ahead cross-zonal capacity
- 43Methodology for calculating scheduled exchanges resulting from single day-ahead coupling
- 44Establishment of fallback procedures
- 45Arrangements concerning more than one NEMO in one bidding zone and for interconnectors which are not operat
Section 2 The single day-ahead coupling process
CHAPTER 6 Single intraday coupling
Section 1 Objectives, conditions and results of single intraday coupling
- 51Objectives of the continuous trading matching algorithm
- 52Results of the continuous trading matching algorithm
- 53Products accommodated
- 54Maximum and minimum prices
- 55Pricing of intraday capacity
- 56Methodology for calculating scheduled exchanges resulting from single intraday coupling
- 57Arrangements concerning more than one NEMO in one bidding zone and for interconnectors which are not operat
Section 2 The single intraday coupling process
Section 3 Transitional intraday arrangements
CHAPTER 7 Clearing and settlement for single day-ahead and intraday coupling
CHAPTER 8 Firmness of allocated cross-zonal capacity
CHAPTER 1 Congestion income distribution methodology for single day-ahead and intraday coupling
CHAPTER 3 Capacity allocation and congestion management cost recovery
- 75General provisions on cost recovery
- 76Costs of establishing, amending and operating single day-ahead and intraday coupling
- 77Clearing and settlement costs
- 78Costs of establishing and operating the coordinated capacity calculation process
- 79Costs of ensuring firmness
- 80Cost sharing between NEMOs and TSOs in different Member States
Source: EU legislation in force, consolidated versions and treaties (Cellar, Publications Office). Official publication. Reuse: Reuse authorised (Commission Decision 2011/833/EU).