Art. 44 Regulation (EU) 2015/1222

Establishment of fallback procedures

In forcesince 24 Jul 2015cited 3×

By 16 months after the entry into force of this Regulation, each TSO, in coordination with all the other TSOs in the capacity calculation region, shall develop a proposal for robust and timely fallback procedures to ensure efficient, transparent and non-discriminatory capacity allocation in the event that the single day-ahead coupling process is unable to produce results.

The proposal for the establishment of fallback procedures shall be subject to consultation in accordance with Article 12.

  • Netcode elektriciteit9.299.36Law

    … prijskoppeling voor day-aheadtransporten overeenkomstig artikel 36, derde lid, artikel 44, artikel 50 en artikel 72 van de Verordening (EU) 2015/1222 (GL CACM), alsmede de op deze artikelen gebaseerde methodologieën en overeenkomsten; c. …

  • Begrippencode elektriciteit1.1Law

    … andere ondersteunende diensten indien de fallback procedure op grond van artikel 12.16 van de Netcode elektriciteit of artikel 44 van Verordening (EU) 2015/1222 (GL CACM) van toepassing is; Referentienummer: Een door de verzendende partij …

  • Systeemcode elektriciteit 20269.19Law

    … het afnemen van energie en indien de fallback procedure is toegepast, bedoeld in artikel 44 van Verordening (EU) 2015/1222 (GL CACM), de voor de desbetreffende onbalansverrekeningsperiode landelijke onbalansprijs voor onbalans met het …