In particular, the PRB points out that there is evidence that the GCE package comprised under Measure 3 enabled MUAC to deliver significantly improved capacity performance in its first year of implementation, namely 2019, which avoided an estimated 30 million EUR of indirect costs from ATM delays for airspace users. The PRB further notes that, in 2020 and 2021, the heavy downturn in traffic due to the COVID-19 pandemic created exceptional circumstances in which the additional flexibility provisions set up under Measure 3 were not necessary. However, the PRB considers that MUAC has adequately mitigated the impact of Measure 3 in respect of 2020 and 2021, given that the revised draft performance plan specifies that “some of the surplus shifts from 2020 and the first quarter of 2021” were deferred in order to be used in the rest of RP3 at no additional cost. The PRB concludes that Measure 3 is overall justified for capacity reasons in RP3, as it is conducive to an improved availability of resources and a maximization of the capacity made available at times of high traffic demand.
98 ASSESSMENT OF THE REVISED PERFORMANCE TARGETS DURING THE DETAILED EXAMINATION › Assessment of the measures invoked by Belgium and Luxembourg to justify the observed deviations from the Union-wide cost-efficiency trends › Measure 3, Decision_act (EU) 2023/1336
In forcesince 16 Jun 2023