32 ASSESSMENT OF THE REVISED PERFORMANCE TARGETS DURING THE DETAILED EXAMINATION › Assessment of the revised performance targets on the basis of the assessment criteria set out in points 1.4 (a), (b) and (c) of Annex IV to Implementing Regulation 2019/317 › Findings on the determined costs for the charging zone, broken down per ANSP, Decision_act (EU) 2023/1336

In forcesince 16 Jun 2023

Based on the evaluation made by the PRB, the Commission notes that both skeyes and MUAC have substantially increased their costs in real terms over RP2 and that those costs continued to increase during RP3, mostly driven by higher staff costs and other operating costs. In 2024, the skeyes staff costs are planned to be higher by 6,9 % from their 2019 level, amounting to a difference of 6,5 million EUR (in EUR 2017). For MUAC, the increase of staff costs incurred in the charging zone, in comparison with the situation in 2019, is even more significant, as those costs are planned to be 30 % higher in 2024 than in 2019, which constitutes an increase of 15,0 million EUR (in EUR 2017).