42 ASSESSMENT OF THE REVISED PERFORMANCE TARGETS DURING THE DETAILED EXAMINATION › Assessment of the revised performance targets on the basis of the assessment criteria set out in points 1.4 (a), (b) and (c) of Annex IV to Implementing Regulation 2019/317 › Findings on the determined costs for the charging zone, broken down per ANSP › Specific observations regarding MUAC, Decision_act (EU) 2023/1336

In forcesince 16 Jun 2023

In this respect, the Commission notes that the determined costs of MUAC are distributed between the MUAC States on the basis of one single criterion, namely the number of qualified ATCOs in service or planned to be in service in the three sector groups [MUAC operations are split in three sector groups, namely the ‘Brussels sector group’, the ‘DECO sector group’ group and the ‘Hannover sector group’.] of MUAC on the 1st of January of each year. The Commission further notes that 92 % of the costs of the Brussels sector group (‘Brussels sector’) are allocated to the Belgium-Luxembourg charging zone. The two other MUAC sector groups, namely ‘the DECO sector group’ and the ‘Hannover sector group’, are located outside of the geographical scope of the Belgium-Luxembourg charging zone and hence do not generate costs allocated to that charging zone.