83 ASSESSMENT OF THE REVISED PERFORMANCE TARGETS DURING THE DETAILED EXAMINATION › Assessment of the measures invoked by Belgium and Luxembourg to justify the observed deviations from the Union-wide cost-efficiency trends › Measure 2, Decision_act (EU) 2023/1336

In forcesince 16 Jun 2023

The second capacity-related measure (‘Measure 2’) consists of the replacement by skeyes of its air traffic management (‘ATM’) system with a single, integrated and harmonized airspace management system to be developed with MUAC and the Belgian Defence as part of the ‘Shared Air Traffic Services System 3’ project (‘SAS 3 project’). That new ATM system of skeyes is however only planned to enter into operation after the end of RP3, possibly not before 2030, and thus only preparatory activities are planned for RP3.