101 ASSESSMENT OF THE REVISED PERFORMANCE TARGETS DURING THE DETAILED EXAMINATION › Assessment of the measures invoked by Belgium and Luxembourg to justify the observed deviations from the Union-wide cost-efficiency trends › Measure 4, Decision_act (EU) 2023/1336

In forcesince 16 Jun 2023

Based on the information contained in the revised draft performance plan, Measure 4 should contribute to accommodating future traffic demand and avoiding unnecessary operational restrictions for airspace users (referred to as ‘over-regulation’), which lead to ATFM delays. The Commission notes that Measure 4 was indicated by Belgium to become operational in 2022, although that information was not expressly confirmed by Belgium during the detailed examination.