Based on the information contained in the revised draft performance plan, Measure 4 should contribute to accommodating future traffic demand and avoiding unnecessary operational restrictions for airspace users (referred to as ‘over-regulation’), which lead to ATFM delays. The Commission notes that Measure 4 was indicated by Belgium to become operational in 2022, although that information was not expressly confirmed by Belgium during the detailed examination.
101 ASSESSMENT OF THE REVISED PERFORMANCE TARGETS DURING THE DETAILED EXAMINATION › Assessment of the measures invoked by Belgium and Luxembourg to justify the observed deviations from the Union-wide cost-efficiency trends › Measure 4, Decision_act (EU) 2023/1336
In forcesince 16 Jun 2023