The second phase (‘Phase II’) refers to the interconnection of the central part of Crete (Heraklion Prefecture) to mainland Greece (Attica region) by means of two HVDC cables, representing a Nominal Transfer Capacity of approximately 1000 MW. At the end of Phase II, the island of Crete is expected to be fully interconnected to the continental electricity transmission system and the electricity demand on the island is to be fully covered. The Phase II cables are expected to be operational by 2023.
8 2. THE ISLAND OF CRETE › The electricity system, Decision_act (EU) 2022/258
In forcesince 21 Feb 2022