15 3. THE REQUESTED DEROGATIONS, Decision_act (EU) 2022/258

In forcesince 21 Feb 2022

The applicant proposes a ‘hybrid model’ for the transitional period, under which the interconnector between Crete and the Greek continental electricity system will be treated as a balance responsible party in the meaning of Article 2(14) of Regulation (EU) 2019/943. Such party will act most of the time as a virtual electricity generation unit from the perspective of Crete and a virtual load from mainland perspective, importing electricity from the mainland Greece to Crete. That flow could be reversed in case of high generation from renewables in Crete, exceeding its load, in order to avoid any curtailment of renewables. The balance responsible party for the interconnection of Crete will physically connect to the Greek continental system on the high voltage side of the Chania substation. Its withdrawn or injected electricity to the Greek continental system will be recorded by the metering infrastructure of the HV Chania substation.