39 5. ASSESSMENT › 5.1. Small connected system, Decision_act (EU) 2022/258

In forcesince 21 Feb 2022

The island of Crete constitutes a small connected system, because its consumption was below the threshold of 3000 GWh in 1996. With the completion of Phase I, around one third of the annual consumption of Crete will be covered by the interconnection with the Greek continental electricity system.