7 2. THE ISLAND OF CRETE › The electricity system, Decision_act (EU) 2022/258

In forcesince 21 Feb 2022

The first phase (‘Phase I’) concerns the grid connection of the western part of Crete (Chania Prefecture) to the Peloponnese peninsula by HVAC lines, representing a Nominal Transfer Capacity of approximately 150 MW. Therefore, the completion of Phase I is expected to cover only a part of Crete’s needs in electricity (approximatively one third of Crete’s electricity consumption, which is 710 MW peak and 3 TWh annual consumption), and will not integrate Crete as a fully interconnected part of the Greek electricity system. The interconnector between the continental electricity system and Crete is expected to operate at or close to its maximum capacity, in view that its capacity does not fully cover the demand of Crete, and electricity will be imported to Crete from the mainland interconnected system due to lower generation costs. The project started operation in trial period from 3 July 2021 [See Article 108B of Law 4001/2011 (Government Gazette Α 179/22.8.2011) as added by Article 106 of Law 4821/2021 (Government Gazette A 134/31.7.2021).], and in commercial period from 1 November 2021 [Pursuant to Article 108C of Law 4001/2011 as added by Article 107 of Law 4821/2021, the Greek Transmission System Operator IPTO S.A. was obliged to fully operate the interconnection of Crete (Phase I) at the latest by 30 September 2021. However, this date was postponed to 1 November 2021 by RAE Decision No 734/28.09.2021 (Government Gazette B 4633/6.10.2021).].