48 5. ASSESSMENT › 5.2. Substantial problem for the operation of the system, Decision_act (EU) 2022/258

In forcesince 21 Feb 2022

In light of what has been said in recitals (42) to (47) as well as in recitals (7) and (8), the Commission concludes that Greece has demonstrated that there are substantial problems for the operation of the electricity system in Crete as a small connected system, until the full interconnection to the continental grid is completed. The temporary hybrid model proposed by the Greek authorities aims at addressing those problems and yields significant benefits compared to the full integration of the Crete’s system into the Greek electricity market during the transitional period.