Art. 57o Commission Regulation (EC) No 952/2006 of 29 June 2006 laying down detailed rules for th…

Payment of aid

In forcesince 1 Oct 2008
1.

The aid, or where an advance has been granted under Article 57n, the balance of the aid shall be paid on the basis of an application for payment and only when the obligations of the contract have been met. Payment of the aid, or the balance of the aid, shall be made following the final check and within 120 days following the day when an application for the payment of aid has been lodged.

2.

The requirements relating to the contractual quantity shall be regarded as being met only where the quantity is verified as specified in Article 57p(5). However Member States may decide that the requirements relating to the contractual quantity are regarded as being met on the basis of a margin of tolerance which shall not exceed 1 % of the contractual quantity.

If the quantity actually stored during the contractual storage period is less than the contractual quantity, account being taken of the possible margin of tolerance, but not less than 80 % of the contractual quantity, the aid for the quantity actually stored shall be reduced by half.

If the quantity actually stored during the contractual storage period is less than 80 % of the contracted quantity, no aid shall be paid.