, Decision_act (EU) 1999/227

In forcesince 29 Jul 1998

The new management of GMH decided, as part of its restructuring, to replace the old blast furnace and converter by an electric arc furnace. In July 1993 Germany notified an aid plan covering R& D aid of DEM 32,5 million. The aid was intended to cover part of the research costs of examining how old dust could be recycled economically in an electric arc furnace. At present, in such cases or when the level of zinc is too high for it to be re-injected into the sinter installations (blast furnace production process), blast furnace dust is stored, for example, in disused mines.

In proceedings pursuant to Article 6(4) of Commission Decision No 3855/91/ECSC of 27 November 1991 establishing Community rules for aid to the steel industry (3), initiated in November 1993 (4), aid of DEM 15,243 million was approved by the Commission by Decision 95/437/ECSC in February 1995 (5). In that Decision, the Commission refused as eligible costs the cost of construction of the electrical arc furnace and de-dusting installation (DEM 62,7 million).

III

GMH produces steel, including special steels and quality steels. Up until September 1994 the crude steel production was carried out in a blast furnace/converter plant. Filter dust, containing ferrum, zinc, carbon and various heavy metals, was collected from the waste air of the converter. Since September 1994 the company has been producing steel using an electric arc furnace.

After the company applied for composition proceedings at the end of 1992, the Land of Lower Saxony assumed the obligation of providing for proper disposal of the filter dust on stock at the GMH site. The new shareholders of GMH intended to cease blast furnace steel making and to replace it by electric steel making. In electric arc furnaces using current technology, converter filter dust cannot be recycled economically.

The Land of Lower Saxony instructed Niedersächsiche Landesentwicklungsgesellschaft mbH (hereinafter referred to as NILEG), a company entirely controlled by the Land, to provide for the proper recycling or disposal of the dust and paid it DEM 69,14 million for doing so. In February 1994, NILEG signed a contract with GMH and instructed GHM, the initial producer and owner of the dust, to try and dispose of it by recycling it using new industrial technology, which was under research as part of the abovementioned R& D project. For this, NILEG paid DEM 61,64 million to GMH in three instalments as follows:

–

March 1994: DEM 21,82 million,