The application highlights the following substantial problems for the operation of small isolated systems:
the difficulty, or even impossibility, of establishing a competitive market for electricity, due to the island’s specific characteristics and small size and the very low level of electricity consumption;
the small size and unique situation of the island of Berlenga (such as seasonal and daily interruptions of supply, a distance of 10 km from the mainland with frequent inaccessibility, and environmental restrictions prohibiting new construction), which make investments in generation and storage assets by companies other than E-REDES or the eventual new concessionaire unlikely. It is improbable that any market activity in generation or supply would be feasible, let alone profitable;
the size of the market, which is unlikely to attract applications for authorisations or bids for tenders. Consumption fluctuates widely during the year and is very low and seasonal;
the strict conditions applicable to human activity on the island, stemming from both Portuguese environmental legislation and the Unesco Statutory Framework of the World Network of Biosphere Reserves;
the distance to the mainland, which, combined with the problems listed in points (a) to (d), makes it economically unfeasible to connect the island’s network to the mainland via an underwater power cable;
the absence of permanent civilian habitation on Berlenga, which makes competition unfeasible. Electricity supply is heavily restricted in terms of availability (limited to daytime) and demand (limited maximum generation output). Electricity services are not continuous throughout the day and only operate during the tourist high season. These characteristics prevent the emergence of retail competition.