Spain notes that the mechanism set out in Royal Decree 738/2015 is also incompatible with the following provisions of Regulation (EU) 2019/943:
Article 22(1), point (f), which sets that the remuneration is to be determined through a competitive process, because according to Spain the remuneration in the existing mechanism is not based on a competitive process, but on a benchmark installation to incentivise efficiency,
Article 22(1), point (h), which sets that capacity mechanisms must be open to the participation of all resources that can provide the required technical performance, because according to Spain the mechanism is applied only to dispatchable installations,
Article 22(2), which sets a list of design features that strategic reserves must comply with, since according to Spain it makes reference to balancing markets that do not exist in the NPT,
Article 22(3), which sets additional requirements to capacity mechanisms other than strategic reserves, since according to Spain the existing mechanism does not comply with those requirements: the retribution does not tend to zero when the capacity level supplied is adequate, the retribution is not only linked to the capacity and the capacity obligations are not transferable,
Article 22(4), which incorporates CO2 emission limit requirements on capacity mechanisms, since according to Spain the current mechanism does not include any requisite of this nature, but it does allow to set technical limitations,
Article 22(5), which requires the adaptation of capacity mechanisms that apply on 4 July 2019.