Spain highlights several challenges and problems for the operation of the electricity markets and systems in the NPT, including Melilla:
the small market size of the NPT, which prevents them from reaping the benefits of the economies of scale present in the mainland electricity system,
the higher costs associated with the fuel mix, which result in higher electricity costs, since most of the generation in the NPT is fuelled by gas, coal or diesel,
the high investment and operation costs derived from the geographical isolation and small size of the systems,
the greater need for installed reserve capacity as a result of the geographical isolation of the systems. In particular, Spain explains that NPT need a higher level of spinning reserve to cover the security of supply standards. Such supply standard is 40-70 % higher than the installed capacity, compared to the 10 % of the mainland. This results in the power plants being idle a significant amount of time, which leads to a low interest to invest in new capacity,
The environmental restrictions for the localisation of new generation capacity, both for conventional and renewable generation facilities,
the cost associated with and the investments needed to build new interconnections with the mainland, due to their geographic location.