7 2. THE BALEARIC ISLANDS › The electricity system and electricity market in the Balearic Islands, Decision_act (EU) 2025/1014

In forcesince 16 May 2025

The Balearic Islands were isolated from Spain’s mainland electricity system until 2012. Historically, the Balearic Islands comprised two electric systems (‘Mallorca-Menorca’ and ‘Ibiza-Formentera’) with capacities of 1,9 GW and 0,3 GW respectively. At the end of year 2012, a cable connected the ‘Mallorca-Menorca’ electricity system with Spain’s mainland system through a 400 MW interconnector, whereas the ‘Ibiza-Formentera’ electricity system remained isolated. Since December 2018, following the entry into operation of a cable connecting Mallorca with Ibiza, the cable has connected the now integrated Mallorca-Menorca-Ibiza-Formentera electricity system to the mainland system [Ministerial Order TEC/1172/2018, of 5 November, redefining the isolated electricity systems of the non-peninsular territory of the Balearic Islands: Orden TEC/1172/2018, de 5 de noviembre, por la que se redefinen los sistemas eléctricos aislados del territorio no peninsular de las Illes Balears y se modifica la metodología de cálculo del precio de adquisición de la demanda y del precio de venta de la energía en el despacho de producción de los territorios no peninsulares. (boe.es).]. In 2023, the cable covered approximately 24 % of the Balearic Islands’ electricity demand [Evolución demanda | Informes del sistema.].