37 II. ASSESSMENT › 1. ADMISSIBILITY › 1.3. THIRD PROVISION: HOT WATER TANKS, Decision_act (EU) 2020/654

In forcesince 13 May 2020

Obligations related to the installation of hot water tanks alongside solid fuel boilers set out under section 5 point 4 of the 1st BImSchV are not related to product design, a requirement to supply information or a requirement for the manufacturer. Therefore, they do not constitute ecodesign requirements within the meaning of Directive 2009/125/EC.