Recital 32, Decision_act (EU) 2002/174

In forcesince 3 May 2000

The second project is the new Comalco refinery. Comalco, a subsidiary of London-based Rio Tinto (RTZ) has a majority stake (67 %) in the bauxite reserves in Weipa, Australia, which are considered to be among the best and cheapest in the world. However, Weipa is an extremely remote area with insufficient infrastructure. To date, the Weipa bauxite is not refined in situ but shipped to the refinery in Gladstone. Comalco is considering building a new refinery in either Gladstone or Malaysia. The decision on the location has still not been made. An eventual decision on the site does not mean that the project is already approved. Indeed, this project has been under discussion for many years and has yet not materialised. It appears that Comalco faces a dilemma in deciding on the site. If Malaysia is chosen the bauxite has to be shipped a long distance adding considerable transport costs. If the refinery is to be built in Gladstone then there is a need to install additional infrastructure to face the structural problems related to energy, and the bauxite has still to be transported from Weipa. A start of production in mid-2002 is therefore rather unlikely.