, Commission interpretative communication on concessions under Community law

In forcesince 29 Apr 2000

As for delimiting the scope of the provisions in the works and services Directives, recital 16 of the latter specifies that if the works are incidental rather than the object of the contract they do not justify treating the contract as a public works contract. In the Gestión Hotelera Internacional case the Court of Justice interpreted these provisions and stated that "where the works [. . ] are merely incidental to the main object of the award, the award, taken in its entirety, cannot be characterised as a public works contract"(20). The problem of mixed contracts was also addressed by the Court of Justice in another case(21) which determined that, when a contract includes two elements which may be separated (e.g. supplies and services), the rules which apply to each should be applied separately.

Although these principles have been established for public contracts, the Commission considers that a similar approach should be taken to determine whether or not a concession is subject to the works Directive. Its field of application ratione materiae is effectively the same in the case of both works contracts and works concessions(22).

In view of this, the Commission maintains that the first thing to determine is whether the building of structures and carrying out of work on behalf of the grantor constitute the main subject matter of the contract, or whether the work and building are merely incidental to the main subject matter of the contract.

If the contract is principally concerned with the building of a structure on behalf of the grantor, the Commission holds that it should be considered to be a works concession.

In this case, the rules laid down by the works Directive must be complied with, as long as the Directive's applicaton threshold is reached (EUR 5000000), even if some of the aspects are service-related. The fact that the works are performed or the structures are built by third parties does not change the nature of the basis contract. The subject matter of the contract is identical.

In contrast, a concession contract in which the construction work is incidental or which only involves operating an existing structure is regarded as a service concession.