, Special Report No 3/99 on the management and control of interest Prate subsidies by the…

In forcesince 16 Jun 1999

1.6. The aid examined comprises all interestPrate subsidies financed by the general budget (GB) of the European Union, the ECSC operating budget or the EDF. The majority of the measures concerned originated with a Council Decision. Measures relating to nonPmember countries are generally included in the agreements, conventions or protocols concluded with the latter. The principle underlying this type of aid is to reduce the financial burden in terms of the interest payable on certain loans contracted by the beneficiaries by either paying part of the interest on their behalf, or refunding it to them.

1.7. Some forms of interestPrate subsidy are not dealt with in this report, inter alia:

(a)

the majority of those relating to measures which have no separate budget heading and are included indiscriminately with other types of subsidy in the budget;

(b)

those paid by national bodies under the Structural Funds, and ERDF "quasiPsubsidies" paid on the basis of loans contracted by the beneficiaries, but in the form of subsidies.

CHARACTERISTICS OF THE MEASURES

2.1. Table 3 sets out the various aid measures in the form of interest subsidies, categorised by their aims. Their objectives and conditions, such as their eligibility criteria, are very diverse and have few common characteristics, in particular because of the divergent economic contexts within which they operate.

2.2. For this reason, the methods of calculation, payment and entry in the accounts vary widely between one measure and another. The only interestPrate subsidies that show significant similarities are those paid in connection with the EDF and in the Mediterranean countries, Malta, Cyprus and Slovenia.

2.3. The annual subsidy rates range from 1,5 % to 4 % of the subsidised amount of the loans, according to the case, over periods ranging from five years to the entire life of a loan. TransPEuropean networks constitute a special case, as the subsidy may amount to 100 % of the interest payable over five years (see paragraph 2.11).

2.4. The financial data relating to measures that comprise interestPrate subsidies are summarised in Table 1 and set out in brief below.

Temporary facility for SMEs