The airport has a single runway (east-west). The 1996 renovation and extension now enable it to receive long-haul traffic. The development work has enabled it to become the region's main airport, where 29 scheduled and 2 charter airlines operate. In 1997 it handled traffic of 6,9 million passengers, up 7,7 % on the previous year. With estimated growth of 5 % for the coming years, the airport should double its traffic by 2010. Much work has been done to prepare for this growth, including the realisation of an additional car park, and the current construction of an Office Centre, and the on-going extension of Terminal 1. The building of the new Terminal 3 to replace the old terminal installations, Terminal 4, new cargo installations, general aviation areas and a rail link to the Hamburg-Stuttgart-Munich line are at the planning stage. The southern part will also be completely altered, with a DEM 20 million project to redesign and regroup part of the US army installations. The airport should then be able to make use of some space in that area. Lack of space forces the airport to plan the work very carefully, so as to ensure continuity of service by transferring passengers and freight to the various installations as the building work progresses.
The changes should help to cater for demand and double the number of gate parking positions for Terminal 1.
2.2. Groundhandling services at the airport
When the German authorities made the decision, the groundhandling market was, in practice, open as regards services to third parties and self-handling for all the activities mentioned in the Annex to the Directive, apart from those covered by points 3 (baggage handling), 4 (physical handling of mail and freight), and 5 (air-side operations).
At Stuttgart, operations concerning aircraft guidance (point 5.1) and parking assistance (point 5.2) may not be opened up to competition; these operations are carried out solely by means of the radio guidance system.
The decision of the German authorities concerns operations between the airport and the aircraft relating to the physical handling of mail and freight (point 4 of the Annex to the Directive), the loading and unloading of the aircraft and the transport of passengers and baggage (part of point 5.4), aircraft take-off (point 5.5) and the moving of the aircraft (point 5.6).