, Decision_act (EU) 1998/630

In force

It must nevertheless be acknowledged that the proliferation of operators makes it harder to manage them and the movements of their trolleys. Such flow control is fundamental and any weakness in its operation could reduce the overall efficiency of the airport. Efficient flow control can only be achieved if there are no problems upstream or downstream of the baggage sorting system. Yet, in the case of Stuttgart airport, the problem is caused by the lack of space for waiting trolleys in front of the doors of the system. The entrance to the baggage system is actually located between the doors where passengers arrive, along the bus lanes. Moreover, these doors are very close together and front-loading buses have to be used. Trolleys cannot therefore be allowed to wait here in large numbers and they could not be parked nearby for another user in addition to the second service provider allowed for in the German authorities' decision.

It is because of this problem of parking near the system, rather than because of a problem inside the building, that we acknowledge that a self-handling user could not be allowed in addition to two operators providing groundhandling services for third parties from January 1999.

However, as stated above, it has not been demonstrated that a self-handling user could not be allowed to operate on the other parts of the airport, especially for aircraft-side operations. The refusal to accept a user loading and unloading his own baggage at the aircraft cannot therefore be accepted.

3.

Measures planned

In accordance with the provisions of Article 9(2) of the Directive, the German authorities must present a schedule of appropriate measures designed to overcome the constraints cited.

An expansion and renovation plan has been adopted by the airport management body, involving extending Terminal 1 and rebuilding Terminal 3; this work will allow four new gate parking positions to be created in place of the present hangar, which will serve as a terminal as soon as work begins on Terminal 3. A rail link to ICE train services is also planned. Finally, the freight area is to be completely reorganised.

A plan to extend the airport site has also been presented but has aroused considerable controversy.

There are plans for a new hall to park groundhandling equipment.