Düsseldorf Airport does not have structural space and capacity problems such as to prevent the opening-up of the groundhandling market. However, the fire in April 1996 severely disrupted the operation of the airport, and, the consequences in terms not only of requirements, equipment and organisation but also of available space do not at present admit of any other supplier for the categories of services referred to in the German decision granting exemption. In accordance with the terms of Article 9(2) of the Directive, Düsseldorf airport has undertaken in its plan to overcome the current constraints so as to release an additional area of more than 21 000 m2 by the beginning of 2001 to allow the opening-up of the market to the degree provided for by the Directive. However, the timetable drawn up by the German authorities does not take account of the fact that some of the temporary equipment needed as a result of the fire, such as vehicles for transporting passengers airside and walkways, could be progressively withdrawn as the reconstruction work progresses, especially with the re-opening of the enlarged Pier A from mid-1998 and its positive implications for the airport in terms of space and traffic-flow.
Similarly, Germany has not shown that it is impossible to liberate part of the space around Pier B on completion of the structural work, nor that the scheduling of all the work at the airport would not allow the areas on the tarmac designated for parking aircraft and groundhandling equipment to be made available more quickly.