Recital 13, Decision_act (EU) 1998/388

In forcesince 14 Jan 1998

According to the airport authorities, the scale of the work will mean that the installations will resume operations only very gradually.

Pier C has been in operation again since November 1996. This Pier is of major importance since it is here that the baggage conveyors for passenger arrivals are located. In order to increase capacity, an extension to the south of the Pier will make it possible to install three more conveyors. This extension has been constructed at the cost of tarmac space, including certain equipment storage areas.

Pier A should be open in mid-1998. Slightly extended, it will then be able to hold four more gates. Until then, passengers arriving at gates at this Pier will have to be transported to Pier C in order to retrieve their baggage.

Pier B is likely to remain completely closed until 2001. Major modifications are needed, including an enlargement over its entire length, with new arrangements for separating Schengen and non-Schengen passengers and additional offices and rooms.

Two modules, D and E, to the east and west cope with the demand provisionally. According to the airport, however, these have little in the way of aprons and this makes ground transport times fairly long.

Under the overall reconstruction plan, the infrastructures will not be completely operative again until 2002. However, the space needed for opening up the ground handling market should, under the plan put forward, be available from the beginning of 2001.

D. The consequences of opening up the market