Art. 76 Regulation (EU) 2017/1485

Proposal for regional operational security coordination

In forcesince 2 Aug 2017cited 7×
1.

By 3 months after the approval of the methodology for coordinating operational security analysis in Article 75(1), all TSOs of each capacity calculation region shall jointly develop a proposal for common provisions for regional operational security coordination, to be applied by the regional security coordinators and the TSOs of the capacity calculation region. The proposal shall respect the methodologies for coordinating operational security analysis developed in accordance with Article 75(1) and complement where necessary the methodologies developed in accordance with Articles 35 and 74 of Regulation (EU) 2015/1222. The proposal shall determine:

(a)

conditions and frequency of intraday coordination of operational security analysis and updates to the common grid model by the regional security coordinator;

(b)

the methodology for the preparation of remedial actions managed in a coordinated way, considering their cross-border relevance as determined in accordance with Article 35 of Regulation (EU) 2015/1222, taking into account the requirements in Articles 20 to 23 and determining at least:

(i)

the procedure for exchanging the information of the available remedial actions, between relevant TSOs and the regional security coordinator;

(ii)

the classification of constraints and the remedial actions in accordance with Article 22;

(iii)

the identification of the most effective and economically efficient remedial actions in case of operational security violations referred to in Article 22;

(iv)

the preparation and activation of remedial actions in accordance with Article 23(2);

(v)

the sharing of the costs of remedial actions referred to in Article 22, complementing where necessary the common methodology developed in accordance with Article 74 of Regulation (EU) 2015/1222. As a general principle, costs of non-cross-border relevant congestions shall be borne by the TSO responsible for the given control area and costs of relieving cross-border-relevant congestions shall be covered by TSOs responsible for the control areas in proportion to the aggravating impact of energy exchange between given control areas on the congested grid element.

2.

In determining whether congestion have cross-border relevance, the TSOs shall take into account the congestion that would appear in the absence of energy exchanges between control areas.

  • Judgment of the General Court (Third Chamber, Extended Composition) of 25 September 2024. Bundesnetzagentur für Elektrizität, Gas, TelekommuDecision

    Moreover, if congestion on a non-critical network element is caused solely by internal flows, the costs of remedial actions to address that congestion will be borne, in any event, by the owner of that network element, in accordance with …

    25 Sep 2024 · 62021TJ0485

  • Systeemcode elektriciteitLaw

    … The mid-point of each market time unit shall be used as the reference timestamp. 4. Pursuant to Articles 70(2) and 76(1)(a) of Regulation 2017/1485, each TSO of each capacity calculation region shall build an intraday IGM for each market …

  • Judgment of the General Court (Third Chamber, Extended Composition) of 25 September 2024. RTE Réseau de transport d'électricité v European UDecision

    Moreover, if congestion on a non-critical network element is caused solely by internal flows, the costs of remedial actions to address that congestion will be borne, in any event, by the owner of that network element, in accordance with …

    25 Sep 2024 · 62021TJ0472

  • Judgment of the General Court (Third Chamber, Extended Composition) of 25 September 2024. Commission de régulation de l’énergie (CRE) v EuroDecision

    Moreover, if congestion on a non-critical network element is caused solely by internal flows, the costs of remedial actions to address that congestion will be borne, in any event, by the owner of that network element, in accordance with …

    25 Sep 2024 · 62021TJ0446

  • Judgment of the General Court (Third Chamber, Extended Composition) of 25 September 2024. Polskie sieci elektroenergetyczne S.A. v European Decision

    Following a long period of cooperation, consultations and discussions between ACER, all the NRAs of the Core region and all TSOs of that region on the TSOs’ proposal and on the amendments made to that proposal during several meetings and …

    25 Sep 2024 · 62021TJ0483

  • Judgment of the General Court (Third Chamber, Extended Composition) of 25 September 2024. TransnetBW GmbH v European Union Agency for the CoDecision

    Moreover, if congestion on a non-critical network element is caused solely by internal flows, the costs of remedial actions to address that congestion will be borne, in any event, by the owner of that network element, in accordance with …

    25 Sep 2024 · 62021TJ0476

  • Judgment of the General Court (Third Chamber, Extended Composition) of 25 September 2024. TenneT TSO GmbH and TenneT TSO BV v European UnionDecision

    Moreover, if congestion on a non-critical network element is caused solely by internal flows, the costs of remedial actions to address that congestion will be borne, in any event, by the owner of that network element, in accordance with …

    25 Sep 2024 · 62021TJ0482