ANNEX II, Regulation (EU) 2017/79

In forcesince 17 Nov 2025cited 1×

1.1.1.

The full-scale impact assessment of vehicles with eCall in-vehicle systems installed, carried out in accordance with point 2, shall be considered satisfactory if the following requirements are demonstrated post-impact.

1.1.2.

Automatic triggering: The eCall system shall automatically initiate an eCall after an impact in accordance with UN Regulation No 94 (Annex 3) as well as UN Regulation No 95 (Annex 4), as applicable.

1.1.3.

Call status indication: The eCall system shall inform the occupants about the current status of the eCall (status indicator) using a visual and/or audible signal.

1.1.4.

MSD emission and encoding: The eCall system shall be able to successfully transmit an MSD to a PSAP test point via the mobile network.

1.1.5.

Vehicle-specific data determination: The eCall system shall be able to populate accurately the mandatory vehicle-specific data fields of the MSD.

1.1.6.

Position determination: The eCall system shall be able to determine accurately the up-to-date vehicle location, including two recent vehicle locations before the generation of the data for the MSD.

The purpose of this test is to verify the automatic triggering function and the sustained functionality of the 112-based eCall in-vehicle system in vehicles that are subjected to a frontal impact or a side impact.

2.2.

The following tests shall be performed on a vehicle with an eCall in-vehicle system installed.

2.3.1.

Impact tests shall be carried out in accordance with the tests defined in UN Regulation No 94, Annex 3 for frontal impact as well as UN Regulation No 95, Annex 4 for side impact, as applicable.

2.3.2.

The test conditions defined in UN Regulation No 94 or UN Regulation No 95 shall apply.

2.3.3.

Before performing the impact tests, ensure that:

(a)

the in-vehicle power source, if installed for the test, is charged according to the specifications of the manufacturer at the beginning of the test to allow performing the subsequent verification tests;

(b)

the automatic eCall is enabled and armed and that the vehicle ignition or master control switch is activated;

(c)

one of the connection procedures defined in point 2.7 of Annex I, as agreed between the technical service and the manufacturer, will be applied for any test eCall;

(d)

the dedicated PSAP test point is available to receive an eCall emitted by the 112-based system;

(e)

a false eCall to a genuine PSAP cannot be made over the live network; and

(f)

if applicable, the TPS system is deactivated or will automatically switch to the 112-based system.

The test procedure described in points 2.4.1 to 2.4.6. shall apply where Annex X is applicable and any of the following conditions is met:

(a)

the eCall STU was not subject of the test laid down in Annex X,

(b)

the eCall STU was subject of the test laid down in Annex X but the back-up power supply in the vehicle is shared with other devices.

2.4.1.

If the automatic eCall was terminated, trigger a manual test eCall.

2.4.2.

Read out any text for at least 5 minutes at the PSAP test point. Alternatively, the test method referred to in point 2.6.2. of Annex III can be performed at this step if the duration of 5 minutes is not exceeded.

2.4.3.

Clear down the eCall using the appropriate PSAP test point command (e.g. hang up).

2.4.4.

Wait for 56 minutes after the call was ended.

2.4.5.

Initiate a call from the PSAP test point to the eCall in-vehicle system.

2.4.6.

If the call is automatically accepted, read out any text for at least 5 minutes at the PSAP test point, otherwise the test is finished.

The positioning test procedure defined in point 2.5 of Annex I to this Regulation shall apply.

2.6.1.

If the connection procedure applied for the test call did not make use of over-the-air data transmission (point 2.7.3 of Annex I to this Regulation), the sustained functionality of the mobile network antenna shall be verified by checking the antenna tuning status after the full-scale impact test according to the procedure defined in point 2.6 of Annex I to this Regulation. In addition, it shall be verified that no wire breakage or short-circuit of the antenna feed line occurred by checking the electrical resistance between the end points of the wire and between the wire and vehicle ground.

The connection procedures defined in point 2.7 of Annex I to this Regulation shall apply.

3.1. Verification of the Minimum Set of Data (MSD)

3.1.1. Verify each of the following items in at least one of the test eCalls:

(a)

Verify that an eCall was triggered automatically by the full-scale impact event. This shall be verified by a record of the PSAP test point showing that it received an eCall following the impact event and that the MSD control indicator was set to ‘automatically initiated eCall’.

(b)

Verify that the eCall status indicator indicated an eCall sequence following the automatic or manual trigger. This shall be verified by a record showing that an indication sequence was performed on all sensory channels specified in the manufacturer’s documentation (visual and/or audible).

(c)

Verify that an MSD was received by the PSAP test point. This shall be verified by a record of the PSAP test point showing that an MSD emitted from the vehicle following the automatic trigger was received and successfully decoded.

(d)

Verify that the MSD contained accurate vehicle-specific data. This shall be verified by a record of the dedicated PSAP test point showing that the information transmitted in the fields regarding vehicle type, vehicle identification number (VIN) and vehicle propulsion storage type does not deviate from the information specified in the type-approval application.

(e)

Verify that the MSD contained an accurate, up-to-date location. This shall be verified in accordance with the Positioning Test Procedure as defined in point 2.5 of Annex I by a test record showing that the deviation between IVS location and true location, d_IVS, is less than 150 metres and the confidence bit transmitted to the PSAP test point indicates ‘position can be trusted’. If no GNSS signals are available at the impact test location, the vehicle can be moved to an appropriate location before performing the test eCall.

(f)

Verify that the MSD contained the two recent locations before the generation of the data for the MSD. This shall be verified by a record of the PSAP test point showing that it received the ‘recentVehicleLocationN1’ and ‘recentVehicleLocationN2’.

(g)

Verify that the MSD contained an up-to-date timestamp. This shall be verified by a test record showing that the timestamp contained in the MSD received by the PSAP test point does not deviate from the exact recorded time of the trigger activation by more than 60 seconds.

3.2. If the automatic test eCall could not be performed successfully due to vehicle-external factors, it shall be permissible to verify the automatic trigger following the impact via the internal record transaction function of the in-vehicle system. This register shall be capable to store received trigger signals in non-volatile memory. The test engineer shall have access to the data stored in the in-vehicle system and shall verify that no record of automatic trigger signal is stored before the impact event and that a record of an automatic trigger signal is stored after the impact event.

3.3. If the test eCall was performed with the vehicle connected to an off-vehicle power supply (in cases where the impact test was carried out with the standard vehicle power supply not installed), verify that the on-board electrical system feeding the eCall in-vehicle system remained intact. This shall be verified by a record of a test engineer confirming a successful check of the integrity of the on-board electrical system including the dummy in-vehicle power source (visual inspection for mechanical damage to either the power source’s mounting bracket or its structure) and the connections via its terminals.

3.4. Verification of Power-Supply test

3.4.1. The requirement is determined to have been passed if the eCall in-vehicle system is capable to communicate for the required period, as specified in point 2 of Annex X. Otherwise, the test is determined to have been failed.