Synchronous Area | Voltage Range | Time period for operation
Continental Europe | 0,85 pu-1,118 pu | Unlimited
1,118 pu-1,15 pu | To be established by each relevant system operator, in coordination with the relevant TSO but not less than 20 minutes
Nordic | 0,90 pu-1,05 pu | Unlimited
1,05 pu-1,10 pu | 60 minutes
Great Britain | 0,90 pu-1,10 pu | Unlimited
Ireland and Northern Ireland | 0,90 pu-1,118 pu | Unlimited
Baltic | 0,85 pu-1,118 pu | Unlimited
1,118 pu-1,15 pu | 20 minutes
Table 4: Minimum time periods an HVDC system shall be capable of operating for voltages deviating from the reference 1 pu value at the connection points without disconnecting from the network. This table applies in case of pu voltage base values at or above 110 kV and up to (not including) 300 kV.
Synchronous Area | Voltage Range | Time period for operation
Continental Europe | 0,85 pu-1,05 pu | Unlimited
1,05 pu-1,0875 pu | To be specified by each TSO, but not less than 60 minutes
1,0875 pu-1,10 pu | 60 minutes
Nordic | 0,90 pu-1,05 pu | Unlimited
1,05 pu-1,10 pu | To be specified by each TSO, but not more than 60 minutes
Great Britain | 0,90 pu-1,05 pu | Unlimited
1,05 pu-1,10 pu | 15 minutes
Ireland and Northern Ireland | 0,90 pu-1,05 pu | Unlimited
Baltic | 0,88 pu-1,097 pu | Unlimited
1,097 pu-1,15 pu | 20 minutes
Table 5: Minimum time periods an HVDC system shall be capable of operating for voltages deviating from the reference 1 pu value at the connection points without disconnecting from the network. This table applies in case of pu voltage base values from 300 kV to 400 kV (included).