Regarding the restructuring plan, the Commission has doubts that it will lead to long-term viability, as required by points 35 and 36 of the Guidelines. The restructuring plan did not contain a description of internal measures to improve the firm’s viability and structure. The plan also lacked compensatory measures to mitigate as far as possible any adverse effects of the aid on competitors, such as a reduction in capacity (points 38 and 39 of the Guidelines). Nor was it possible to ascertain that the amount and intensity of the aid were limited to the strict minimum of the restructuring costs necessary (points 43 and 45 of the Guidelines). Specifically, the plan lacked any reference to a contribution from the recipient.
20 II. DESCRIPTION OF THE MEASURE › 4. Grounds for initiating the procedure, Decision_act (EU) 2012/178
In forcesince 23 Mar 2011