(47)
The Spanish authorities submitted the criteria which have been used when categorising production units as aid beneficiaries under Article 4 or Article 5(3) of Regulation (EC) No 1407/2002. As the main criterion, the cost of production per ton coal equivalent (tce) was fixed, and the following were established as secondary criteria:
(a)
existence of a market, i.e. there should be an operating power station within a 100 kilometre radius;
(b)
solvency of the undertaking which owns the production unit; in this regard, there should be a minimum proportion between the undertaking’s capital and liabilities.