The Hunosa Plan envisaged the implementation of a set of measures designed to ensure that production levels were scaled down. First, two of the existing nine production units were closed. Added to this was the closure of the washery. The closure of these three sites represents a 25 % reduction in productive capacity. Secondly, action was taken to optimise productivity, the focus being on measures concerning the selection of deposits, the degree of modernisation and washing processes. Efforts were concentrated on those pits which offered the highest productivity, the lowest overall costs and the best quality. In principle, part of the production was to be reserved for the nearby power plant and Hunosa had to deliver annually coal for 100 days’ consumption. Thirdly, the planned reduction in activity makes it necessary to reduce the undertaking’s workforce. Lastly, as a result of the measures taken, production during the lifetime of the plan will fall by 26,1 % overall from 1800000 tonnes in 2001 to 1340000 tonnes in 2005.
29 2. DETAILED DESCRIPTION OF THE MEASURE › 2.4. Plan concerning the coal-mining company Hunosa, Decision_act (EU) 2011/693
In forcesince 21 Dec 2005