In order to explain why the production of Hunosa forms part of the plan for accessing coal reserves, the Spanish authorities refer to the accessibility of the reserves from a technical viewpoint, the demand of the power plants located nearby, the quality of the coal and the needs of power plants equipped with technical installations suited to the quality of the coal produced at Hunosa. The Commission notes that Spain has abandoned the criterion of a 100-day supply for the nearest power plant. As explained by the Spanish authorities, this was merely a hypothetical example and was never meant to be used as a criterion. However, the fact that it is an example does not detract from the fact that the Spanish authorities have taken the decision that Hunosa’s reserves should cover a certain percentage of the demand of the power plants located in the same area. In view of the flexibility of this criterion, the Commission notes that the Spanish authorities can be expected not to infringe the free movement of goods.
123 4. ASSESSMENT OF THE AID › 4.6. Hunosa plan › 4.6.3. Aid to Hunosa for accessing coal reserves, Decision_act (EU) 2011/693
In forcesince 21 Dec 2005