, Decision_act (EU) 1996/671

In forcesince 13 Nov 1996
–

despite requests to be kept informed and a letter formally advising of omission in reporting receipt, an inventory change report for the transfer of material on 7 October 1993 could only be obtained during the inspection on 13 October 1995. Euratom stated that such delays were unacceptable and requested that any future declarations related to remaining stocks or movements of nuclear material be made according to Commission Regulation (Euratom) No 3227/76,

–

source documents to justify the stock records could still not be made available,

–

the explanation provided regarding the apparent discrepancy of 1,466 tonnes depleted and 7,5 kilograms natural uranium was unsatisfactory.

–

On 29 November 1995, a hearing with the representatives of Jenson Tungsten Ltd and the British authorities was held in London with the objective of clarifying the position of Jenson Tungsten Ltd with respect to the Euratom Treaty (Chapter VII), Commission of the European Atomic Energy Community Regulation No 8 and Regulation (Euratom) No 3227/76. Among other issues the hearing led to the conclusion:

–

that Jenson Tungsten Ltd had failed to keep adequate records for depleted and natural uranium stored on site,

–

that source documents and operating records to justify inventory changes had not been provided,

–

that a materials accountancy system did not exist for an unacceptably long time,

–

that the shipment of 6,407 tonnes of depleted uranium on 7 October 1993 had been declared only on request and after an unacceptably long delay,

–

that appropriate labelling of the remaining swarf on site was still required,

–

that there was an outstanding discrepancy of 1,466 tonnes depleted uranium and 7,5 kilograms natural uranium.

The facts set out above are not contested by the operator.

II.

LEGAL ASSESSMENT

A. Legal provisions

  • celex=31976R3227
  • celex=31993R2130