The operator was also reminded that, before shipping any nuclear material, it would have to be characterized and, when shipped, reported according to the Commission regulations. Following this audit, and based on information provided by the operator, a stock figure was agreed as at 31 July 1992. This figure was 9,073 tonnes depleted uranium and 7,5 kilograms natural uranium.
On 12 May 1994, following a letter from the Euratom Safeguards Directorate (hereinafter 'Euratom`) dated 23 March 1994 enquiring about the situation of depleted uranium swarf awaiting disposal, Jenson Tungsten Ltd confirmed that 6,407 tonnes depleted uranium swarf had been dispatched on 7 October 1993.
On 19 September 1994, following various actions resulting from the inspection of 9 March 1992 and the shipment of 7 October 1993, Euratom requested Jenson Tungsten Ltd in writing to comment on the calculated residual inventory figures of 2,666 tonnes depleted uranium and 7,5 kilograms natural uranium.
On 7 April 1995, Euratom received Jenson Tungsten Ltd's reply which stated:
that four containers holding depleted uranium swarf remained on the site,
that Jenson Tungsten Ltd was not in a position to confirm the precise weight of the remaining material and that their best estimate based on the weight of the containers already disposed of was 1,2 tonnes,
that Jenson Tungsten Ltd intended to forward all remaining material for weighing and disposal, but would not be able to do so until later in 1995 because of processing difficulties at the receiver's site,
that Jenson Tungsten Ltd would submit an inventory change report giving details of the precise amounts of material as soon as the material had been shipped and verified at the receiving installation.
On 26 April 1995, Euratom carried out another inspection at Jenson Tungsten Ltd.
On 16 May 1995, the first results of the inspection on 26 April were faxed to Jenson Tungsten Ltd. They were considered unsatisfactory because:
no documentation was provided to the inspectors concerning the holdings of nuclear materials which meant that no source documents, operating records or nuclear materials accounts were made available. Stock containers were not labelled,