a discrepancy became apparent. Since the stock figure of 9,073 tonnes depleted uranium and 7,5 kilograms natural uranium had been established, the only movement had been the shipment of 6,407 tonnes of depleted uranium. No activities, for example machining of uranium, had taken place. The best estimate of the residual stock being 1,2 tonnes of depleted uranium, there was a discrepancy of 1,466 tonnes depleted uranium and 7,5 kilograms natural uranium.
The operator was reminded of the need to report shipments.
On 2 June 1995, Euratom received a reply (undated). Jenson Tungsten Ltd gave details about the history which led to the unsatisfactory situation. In particular, the letter stated that at the previous inspection in March 1992 the operator had said that the Official Receiver of one of Jenson Tungsten Ltd's predecessors who had gone bankrupt had not made the records available. During the inspection, the amount of depleted uranium on site had been estimated. The letter also stated that the natural uranium had probably been put in with the remainder of the swarf and that the estimates were necessarily imprecise.
On 2 June 1995, Euratom's requests following the results of the inspection on 26 April 1995 were communicated in detail to Jenson Tungsten Ltd:
the basic technical characteristics dated 18 May 1992 were to be revised,
a nuclear material accountancy system fulfilling the requirements of Commission Regulation (Euratom) No 3227/76 was to be established. This request had already been made in writing as a result of the inspection on 9 March 1992 but the inspectors concluded after the inspection on 26 April 1995 that such a system still did not exist,
this system should include the requirement, before shipment, to characterize any nuclear material including swarf by batch designation, material description, category, weight of element and obligation. All shipments of nuclear material must be reported according to the stipulations in Regulation (Euratom) No 3227/76. This had not been the case, in particular for the shipment of 6,407 tonnes depleted uranium swarf;
it should be explained why the following requirements had not been observed:
operating records to permit accounting,
accounting and records system,
records to be retained for a period of at least five years,
reports of all inventory changes,
the discrepancy as indicated by fax of 16 May 1995 should be explained,