Sealink wrote to SC on 29 September 1992 listing the marine implications of a SeaCat operation from the port of Holyhead which it said needed to be examined. These included:
the effect of a SeaCat passing a vessel at Admiralty Pier,
the effect of conventional vessels passing a SeaCat while it was in berth,
the effect of a SeaCat manoeuvring in close proximity to vessels moored along the East Dock,
the requirement for a lay-by berth in the harbour,
reduced sea room available to vessels entering and leaving the harbour from Station Berth,
the time taken by a SeaCat to manoeuvre in bad weather.
Sealink stated that these concerns required careful consideration and appropriate advice from experts. Sealink asked if SC wished Sealink to put in hand a mathematical study of the effect of SeaCat manoeuvring, the cost to be paid by SC. Sealink was not yet in a position to provide details of when land on the west side would need to be released for development.