9 Appendix G Partial Fulfilment, Regulation (EU) 2026/693

In forcesince 19 Mar 2026

Notwithstanding the options allowed in this TSI, e.g. under point 7.3.2 or in subset 34, it is possible to deviate from this TSI provided that compliance with provisions of point 6.1.1.2 and the deviation fulfils one of the categories below and limited to the defined cases in the table underneath:

(1)

Functions requiring upgrades of existing installations which would compromise the economic viability of a project regarding upgrades of already authorized hardware installed in the vehicles

[Some new functionalities included in this TSI are excluded from the on-board envelopes up to 2.1 and 2.2. These reduced envelopes will be specified in SUBSET-153.] [The following on-board functionalities impacting the ETCS on-board system version are excluded in the reduced on-board envelope up to 2.1 as specified in SS-153: CR968;CR988;CR1238;CR1244; CR1302;CR1344;CR1346;CR1350;CR1359;CR1363;CR1367;CR1374;CR1375;CR1379; CR1397.] [The following on-board functionalities impacting the ETCS on-board system version are excluded in the reduced on-board envelope up to 2.2 as specified in SS-153: CR968;CR988;CR1244;CR1302; CR1344;CR1346;CR1350;CR1359;CR1363;CR1367;CR1374;CR1375;CR1379;CR1397.]

Partial fulfilment of TSI Requirement | Conditions and mitigation measures | Scope of application of partial fulfilment

SUBSET-091: safety requirements leading to DMI SIL 2 may not be implemented. | The associated hazards linked to the safety requirements leading to DMI SIL 2 shall be mitigated by appropriate measures. | Only allowed in case of upgrading an existing ETCS part (with DMI SIL 0).

Intentionally deleted. | Intentionally deleted. | Intentionally deleted.

Intentionally deleted | Intentionally deleted | Intentionally deleted