This Decision sets out the Commission’s doubts about the consistency with the Union-wide targets of the revised cost-efficiency performance targets of Switzerland contained in the revised draft FABEC performance plan. In parallel, the EU Member States part of FABEC have been notified separately by the Commission of the doubts about the consistency of the Netherlands’ revised cost-efficiency performance targets with the Union-wide targets.
8 GENERAL CONSIDERATIONS, Decision_act (EU) 2026/866
In forcesince 27 Mar 2026