The PRB has calculated the estimated difference between the determined costs for RP4 set by Switzerland in the revised draft FABEC performance plan and the determined costs that would be required to meet the long-term Union-wide DUC trend for RP3 and RP4 combined. Based on the PRB findings, the total determined costs for RP4 proposed by Switzerland fall short by approximately EUR 289,5 M in EUR2022 from the level required to meet the long-term Union-wide DUC trend, which corresponds to an annual average gap of EUR 57,9 M in EUR 2022.
21 REASONS FOR INITIATING A DETAILED EXAMINATION, Decision_act (EU) 2026/866
In forcesince 27 Mar 2026