ANNEX I STERILE PRODUCTS AND ASEPTIC MANUFACTURING, Regulation (EU) 2025/2091

In forcesince 17 Oct 2025

The additional requirements set out in this Annex shall apply to the manufacture of sterile products and products where aseptic manufacturing is required.

II.

1. The manufacture of sterile products is subject to special requirements in order to minimise risks of microbial, particulate and endotoxin/pyrogen contamination. The following aspects shall be specifically considered:

(a)

premises, equipment and processes shall be appropriately designed, qualified and/or validated and, where applicable, subjected to ongoing verification. The use of appropriate technologies (e.g. restricted access barriers systems, isolators, robotic systems, rapid/alternative methods and continuous monitoring systems) shall be considered to increase the protection of the product from potential extraneous sources of endotoxin/pyrogen, particulate and microbial contamination, and assist in the rapid detection of potential contaminants in the environment and in the product;

(b)

personnel shall have adequate qualifications and experience and training with a specific focus on the principles involved in the protection of sterile products;

(c)

processes and monitoring systems for the manufacture of sterile products shall be designed, commissioned, qualified, monitored and regularly reviewed by personnel with appropriate knowledge (including on aspects related to the process and relevant engineering and microbiological knowledge);

(d)

raw materials and packaging materials shall be adequately controlled and tested to ensure that the level of bioburden and endotoxin/pyrogen are suitable for use;

(e)

processes associated with the finishing and storage of sterile products shall not compromise the sterility of the product. Aspects to be considered in this regard include container integrity and maintenance of adequate storage conditions;

(f)

all non-conformities, such as sterility test failures, environmental monitoring excursions or deviations from established procedures shall be adequately investigated before certification/release of the batch. The investigation shall determine the potential impact on the process and product quality and whether any other processes or batches are potentially impacted. The reason for including or excluding a product or batch from the scope of the investigation shall be clearly justified and recorded.

II.

2. Processes, equipment, premises and manufacturing activities shall be managed in accordance with quality risk management principles so as to proactively identify, evaluate and control potential risks to quality. Monitoring or testing alone are not considered sufficient – on their own – to ensure sterility.

II.

3. A contamination control strategy shall be developed by the manufacturer and be implemented in the site. The contamination control strategy shall aim at avoiding contamination by identifying all the critical control points and assessing the effectiveness of all the controls (design, procedural, technical and organisational) and monitoring measures implemented to manage the risks. The effectiveness of the contamination control strategy shall be periodically reviewed and, where appropriate, updated and shall also drive continual improvement of the manufacturing and control methods.

II.

4. While the contamination control strategy includes a series of interrelated measures that are typically assessed, controlled and monitored individually, the effectiveness of the implemented measures shall be assessed altogether.

II.

5. The development of the contamination control strategy requires detailed technical and process knowledge. Potential sources of contamination are attributable to microbial and cellular debris (e.g. pyrogen, endotoxin) as well as particulate (e.g. glass and other visible and sub-visible particles). Elements to be considered within a contamination control strategy include but are not limited to:

plant and processes design, including the associated documentation;

premises and equipment;

personnel;

utilities;

raw material controls, including in-process controls;

product containers and closures;

approval of key component suppliers and critical service providers;

management of outsourced activities and availability/transfer of critical information between parties;

process validation, including validation of sterilisation processes;

preventive maintenance: maintaining equipment, utilities and premises (planned and unplanned maintenance) so as to minimise the risk of contamination;

cleaning and disinfection;

monitoring systems, including an assessment of the feasibility of the introduction of scientifically sound, alternative methods that optimise the detection of environmental contamination;

prevention mechanisms: trend analysis, detailed investigation, root cause determination, corrective and preventive actions and the need for comprehensive investigational tools;

continuous improvement based on information derived from the above.

II.

6. Changes to the systems in place shall be assessed for any impact on the contamination control strategy before and after implementation.

II.

7. The manufacturer shall take all the steps and precautions necessary to ensure the sterility of the products manufactured within its facilities. Sole reliance shall not be placed on any terminal process or finished product test.

III.

1.1. The manufacture of sterile products shall be carried out in appropriate cleanrooms, entry to which shall be through change rooms that act as airlocks for personnel and airlocks for equipment and materials.

III.

1.2. Cleanrooms and change rooms shall be maintained to an appropriate cleanliness standard and supplied with air that has passed through filters of an appropriate efficiency. Controls and monitoring shall be scientifically justified and shall effectively evaluate the state of environmental conditions of cleanrooms, airlocks and pass-through hatches.

III.

1.3. The various operations of component preparation, product preparation and filling shall be carried out with appropriate technical and operational separation measures within the cleanroom or the premises to prevent mix up and contamination.

III.

1.4. Restricted Access Barrier Systems (RABS) [For the purposes of this Annex, ‘restricted access barrier system’ means a system that provides an enclosed, but not fully sealed, environment meeting defined air quality conditions, and using a rigid-wall enclosure and integrated gloves to separate its interior from the surrounding cleanroom environment. The inner surfaces of the RABS are disinfected and decontaminated with a sporicidal agent. Operators use gloves, half suits, rapid transfer system/ports and other integrated transfer ports to perform manipulations or convey materials to the interior of the RABS. Depending on the design, doors are rarely opened, and only under strictly pre-defined conditions.] or isolators can minimise microbial contamination associated with direct human interventions in the critical zone [For the purposes of this Annex, ‘critical zone’ means a space within the aseptic processing area in which product and critical surfaces are exposed to the environment.]. Their use shall therefore be considered as part of the contamination control strategy; the use of alternative approaches shall be justified.

III.

1.5. The following grades of cleanroom/zone shall be used:

(a)

Grade A: for high-risk operations, such as aseptic processing line, filling zone, stopper bowl, open primary packaging or for making aseptic connections under the protection of first air [For the purposes of this Annex, ‘first air’ means filtered air that has not been interrupted prior to contacting the exposed product and product contact surfaces.].

Grade A conditions are usually provided by a localised airflow protection, such as unidirectional airflow [For the purposes of this Annex, ‘unidirectional airflow’ means an airflow moving in a single direction, in a robust and uniform manner, and at sufficient speed, to reproducibly sweep particles away from the critical processing or testing area.] workstations within RABS or isolators. The maintenance of unidirectional airflow shall be demonstrated and qualified across the whole of the grade A area. Direct intervention (e.g. without the protection of barrier and glove port technology) into the grade A area by operators shall be minimised.

(b)

Grade B: this is the background cleanroom for grade A for aseptic preparation and filling (except for isolators). Air pressure differences shall be continuously monitored. Cleanrooms of lower grade than grade B may be considered where isolator technology is used (see Section III.3.3 of this Annex).

(c)

Grade C and D: for less critical stages in the manufacture of aseptically filled sterile products or as a background for isolators. They may also be used for the preparation/filling of terminally sterilised products.

III.

1.6. In cleanrooms and critical zones, all exposed surfaces shall be smooth, impervious and unbroken in order to minimise the shedding or accumulation of particles or micro-organisms.

III.

1.7. To reduce the accumulation of dust and to facilitate cleaning there shall be no recesses that are difficult to clean effectively. Therefore, projecting ledges, shelves, cupboards and equipment shall be kept to a minimum. Doors shall be designed to avoid recesses that cannot be cleaned. Sliding doors are generally undesirable for this reason.

III.

1.8. Materials used in cleanrooms, both in the construction of the room and for items used within the room, shall be selected to minimise generation of particles and to permit the repeated application of cleaning, disinfectant and sporicidal agents as appropriate.

III.

1.9. Ceilings shall be designed and sealed to prevent contamination from the space above them.

III.

1.10. Sinks and drains are not allowed in the grade A and grade B areas. In other grades, air breaks shall be fitted between the machine or sink and the drains. Floor drains in lower grade cleanrooms shall be fitted with traps or water seals designed to prevent back flow and shall be regularly cleaned, disinfected and maintained.

III.

1.11. Cleanrooms shall be supplied with a filtered air supply that maintains a positive pressure and/or an airflow relative to the background environment of a lower grade under all operational conditions and shall flush the area effectively. Adjacent rooms of different grades shall have an air pressure difference of a minimum of 10 Pascals (guidance value). Particular attention shall be paid to the protection of the critical zone.

III.

1.12. The above-referred requirements regarding air supplies and pressures may be modified where necessary to contain certain materials (e.g. pathogenic, highly toxic or radioactive products or live viral or bacterial materials). The modification may include positively or negatively pressurised airlocks that prevent the hazardous material from contaminating the surrounding areas. Where for reasons of containment, it is necessary for the air to flow into a critical zone, the source of the air shall be from an area of the same or higher grade.

III.

1.13. Decontamination of facilities (e.g. the cleanrooms and the heating, ventilation, and air-conditioning (HVAC) systems) and the treatment of air leaving a clean area, may be necessary for some operations based on a risk assessment (e.g. in the context of production involving pathogenic, highly toxic or radioactive materials or live viral or bacterial materials, when there is a risk of spreading to the environment, or when contamination has been detected).

III.

1.14. Airflow patterns within cleanrooms and zones shall be visualised and it shall be demonstrated that there is no ingress from lower grade to higher grade areas and that air does not travel from less clean areas (such as the floor), operators or equipment so that contamination may be transferred to the higher-grade areas. In particular, the following applies:

(a)

Where unidirectional airflow is required, visualisation studies shall be performed to determine compliance.

(b)

Where filled, closed products are transferred to an adjacent cleanroom of a lower grade via a small egress point, airflow visualisation studies shall demonstrate that air does not ingress from the lower grade cleanrooms to the grade B area.

(c)

Where air movement is shown to be a contamination risk to the clean area or critical zone, corrective actions, such as design improvement, shall be implemented.

(d)

Airflow pattern studies shall be performed both at rest and in operation (e.g. simulating operator interventions). Video recordings of the airflow patterns shall be retained. The outcome of the air visualisation studies shall be documented and be duly considered when establishing the facility’s environmental monitoring programme.

III.

1.15. Indicators of air pressure differences shall be installed between cleanrooms and/or between isolators and their background. Set points and the criticality of air pressure differences shall be addressed as part of the contamination control strategy. Air pressure differences identified as critical shall be continuously monitored and recorded. A warning system shall be in place to instantly indicate and warn operators of any failure in the air supply or reduction of air pressure differences (below set limits for those identified as critical). The warning signal shall not be overridden without an assessment and a procedure shall be available to outline the steps to be taken when a warning signal is given. Where alarm delays are set, these shall be assessed and justified. Other air pressure differences shall be monitored and recorded at regular intervals.

III.

1.16. Facilities shall be designed to permit observation of production activities from outside the grade A and B areas (e.g. through the provision of windows or remote cameras with a full view of the area and processes to allow observation and supervision without entry). This requirement shall be implemented when designing new facilities or during refurbishment of existing facilities.

III.

2.1. The transfer of equipment and materials into and out of the cleanrooms and critical zones is one of the greatest potential sources of contamination and appropriate controls shall be therefore implemented. In particular, the transfer of materials, equipment, and components into the grade A or B areas shall be carried out via a unidirectional process. Where possible, items shall be sterilised and passed into these areas through double-ended sterilisers (e.g. through a double-door autoclave or a depyrogenation oven/tunnel) sealed into the wall. Where sterilisation upon transfer of the items is not possible, a validated procedure which achieves the same objective of not introducing contamination shall be implemented (e.g. using an effective transfer disinfection process, rapid transfer systems for isolators or, for gaseous or liquid materials, a bacteria-retentive filter). The removal of items from the grade A and B areas (e.g. materials, waste, environmental samples) shall be carried out via a separate unidirectional process. If this is not possible, a time-based separation of movement (incoming/exiting material) shall be considered and adequate controls shall be applied to avoid potential contamination.

III.

2.2. Only materials and equipment that have been included on an approved list, which is developed on the basis of an assessment during the validation of the transfer process, shall be transferred into the grade A or grade B areas via an airlock or pass-through hatches. Any unapproved items that require transfer shall be pre-approved as an exception.

III.

2.3. The movement of material or equipment from a lower grade or unclassified area to a higher-grade clean area shall be subject to cleaning and disinfection commensurate with the risks. Equipment and materials (intended for use in the grade A area) shall be protected when transiting through the grade B area. Appropriate risk assessment and mitigation measures shall be applied and recorded, including a specific disinfection and monitoring programme approved by the department responsible for quality assurance.

III.

2.4. Airlocks shall be designed and used to provide physical separation and to minimise microbial and particle contamination of the different areas and shall be used for material and personnel moving between different grades. Wherever possible, airlocks used for personnel movement shall be separated from those used for material movement. Where this is not possible, time-based separation of movement (personnel/material) shall be considered. Airlocks shall be flushed effectively with filtered air to ensure that the grade of the cleanroom is maintained. The final stage of the airlock shall, in the ‘at rest’ state, be of the same cleanliness grade (viable and total particle) as the cleanroom into which it leads. The use of separate change rooms for entering and leaving the grade B area is desirable. Where this is not possible, time-based separation of activities (ingress/egress) shall be considered. Where the risk of contamination is high, separate change rooms for entering and leaving production areas shall be used.

III.

2.5. The following aspects shall be considered in the design of airlocks:

Personnel airlocks [For the purposes of this Annex, ‘personnel airlock’ means an area of increasing cleanliness used for entry of personnel (e.g. from the grade D area to the grade C area, or from the C area to the grade B area).]: In general, hand-washing facilities shall be provided only in the first stage of the changing room and not be present in changing rooms directly accessing the grade B area.

Material airlocks [For the purposes of this Annex, ‘material airlock’ means an area used for transfer of materials and equipment.]: Airlock and pass-through hatches shall be designed to protect the higher-grade environment, for example by effective flushing with an active filtered air supply.

For pass-through hatches and airlocks (for material and personnel), the entry and exit doors shall not be opened simultaneously. For airlocks leading to the grade A and grade B areas, an interlocking system shall be used. For airlocks leading to grade C and D areas, at least a visual and/or audible warning system shall be implemented. Where required to maintain the segregation of the area, a time delay between the closing and opening of interlocked doors shall be implemented.

III.

3.1. Isolators and RABS and associated processes shall be designed to provide protection through the separation of the grade A environment from the environment of the surrounding room. The hazards introduced from the entry or removal of items during processing shall be minimised by the implementation of appropriate technologies or validated systems.

III.

3.2. The design of the technology and processes used shall ensure that appropriate conditions are maintained in the critical zone to protect the exposed product during the operations.

(a)

Requirements for isolators:

The design of open isolators shall ensure grade A conditions with first air protection in the critical zone and unidirectional airflow that sweeps over and away from the exposed products during processing.

The design of closed isolators shall ensure grade A conditions with adequate protection for the exposed products during processing. Airflow may not be fully unidirectional in closed isolators where simple operations are conducted. However, any turbulent airflow [For the purposes of this Annex, ‘turbulent airflow’ means air that is not unidirectional. Turbulent air in cleanrooms shall flush the cleanroom via mixed flow distribution and ensure maintenance of an acceptable air quality.] shall not increase the risk of contamination of the exposed product. Where processing lines are included in closed isolators, grade A conditions shall be ensured with first air protection in the critical zone and unidirectional airflow that sweeps over and away from the exposed products during processing.

Negative pressure isolators shall only be used when containment of the product is considered essential (e.g. radiopharmaceutical products) and specialised risk control measures shall be applied to ensure that the critical zone is not compromised.

(b)

Requirements for RABS: The design of RABS shall ensure grade A conditions with unidirectional airflow and first air protection in the critical zone. A positive airflow from the critical zone to the supporting background environment shall be maintained.

III.

3.3. The background environment for isolators or RABS shall ensure that the risk of transfer of contamination is minimised.

(a)

Requirements for isolators:

The background classification applied shall be based on a risk assessment and justified as part of the contamination control strategy. The background environment for open isolators shall generally correspond to a minimum of grade C, while the background for closed isolators shall correspond to a minimum of grade D.

Key considerations when performing the risk assessment for the contamination control strategy of an isolator include the bio-decontamination programme, the extent of automation, the impact of glove manipulations that may potentially compromise ‘first air’ protection of the critical process points, the impact of potential loss of barrier/glove integrity, transfer mechanisms used and activities such as set-up or maintenance that may require the doors to be opened prior to the final bio-decontamination of the isolator. Where additional process risks are identified, a higher grade of background shall be implemented unless appropriately justified in the contamination control strategy.

Airflow pattern studies shall be performed at the interfaces of open isolators to demonstrate the absence of air ingress.

(b)

Requirements for RABS: The background environment for RABS used for aseptic processing shall correspond to a minimum of grade B and airflow pattern studies shall be performed to demonstrate the absence of air ingress during interventions, including door openings if applicable.

III.

3.4. The materials used for glove systems (for both isolators and RABS) shall have appropriate mechanical and chemical resistance. The frequency of glove replacement shall be defined as part of the contamination control strategy.

(a)

Requirements for Isolators:

Leak testing of the glove system shall be performed using a suitable methodology having regard to the intended use and the risks involved. The testing shall be performed at defined intervals. In general, glove integrity testing shall be performed at least at the beginning and at the end of each batch or campaign. Additional glove integrity testing may be necessary depending on the campaign length.

Glove integrity monitoring shall include a visual inspection associated with each use and following any manipulation that may affect the integrity of the system.