Art. 19 Regulation (EU) 2024/2027

Site visits

In forcesince 26 Jul 2024
1.

The verifier shall carry out site visits in order to gain sufficient understanding of the company and the ship’s monitoring and reporting system as described in the monitoring plan.

2.

The verifier shall determine the location or locations for the site visit on the basis of the results of the risk assessment and after taking into consideration the place where the critical mass of relevant data is stored, including electronic or hard copies of documents, and the place where data-flow activities and control activities are carried out.

3.

On the basis of the outcome of a site visit to an onshore location, where it concludes that an onboard verification is needed to reduce the risk of material misstatements in the FuelEU report or partial FuelEU report, the verifier may decide to visit the ship.

4.

The verifier shall also determine and communicate to the company the activities to be performed and the time needed for the site visit.

5.

The company shall provide the verifier access to its sites, including to its relevant onshore locations and relevant ships.

6.

The verifier may carry out a virtual site visit provided that, on the basis of the outcome of the risk assessment, one of the following conditions is fulfilled:

(a)

the verifier has sufficient understanding of the ship’s monitoring and reporting systems, including their existence, implementation and effective operation by the company;

(b)

the nature and level of complexity of the ship’s monitoring and reporting system are such that a physical site visit is not required;

(c)

the verifier is able to obtain and assess remotely all requisite information, including correct application of the methodology described in the monitoring plan and verification of the data reported in the FuelEU report or partial FuelEU report;

(d)

where serious, extraordinary and unforeseeable circumstances, outside the control of the company, prevent the verifier from carrying out a physical site visit and where those circumstances cannot, after using all reasonable efforts, be overcome.

The verifier shall take measures to reduce the verification risk to an acceptable level to obtain reasonable assurance that the FuelEU report or partial FuelEU report is in conformity with Regulation (EU) 2023/1805.

The decision to carry out a virtual site visit shall be made after determining that the conditions for carrying out a virtual site visit are met. The verifier shall inform without undue delay the company of the decision to carry out a virtual site visit and that the conditions for carrying out a virtual site visit are met.

7.

With the exception of paragraph 6, point (d), the verifier shall not carry out a virtual site visit where no physical site visit has been carried out in the three reporting periods immediately preceding the current reporting period. The 3-year period shall only cover verifications of FuelEU reports performed for the company after the date of entry into force of this Regulation.

8.

The decision to carry out a virtual site visit shall be made after determining that the conditions for carrying out a virtual site visit are met. The verifier shall inform the company thereof without undue delay.

9.

The verifier may decide to waive a site visit or a virtual site visit as referred to in paragraphs 1 and 6 respectively provided that all conditions set out in paragraph 6, points (a), (b) and (c), are fulfilled.

10.

A site visit and a virtual site visit as referred to in paragraphs 1 and 6 respectively shall not be waived in either of the following situations:

(a)

where the FuelEU report of a ship is verified for the first time by the verifier;

(b)

where a verifier has not carried out a site visit in two reporting periods immediately preceding the current reporting period.

11.

The decision to waive a site visit shall be made after determining that the conditions for waiving site visits are met. The verifier shall inform the company thereof without undue delay.

12.

Where the verifier carries out a virtual site visit pursuant to paragraph 6 or waives a site visit pursuant to paragraph 9, it shall provide justification for doing so in the internal verification documentation.