The verifier shall draft a verification plan reflecting the information obtained and the risks identified during the risk assessment. The verification plan shall include at least:
(a)
a verification programme describing the nature and scope of the verification activities and the time and manner in which they are to be carried out;
(b)
a test plan setting out the scope and methods of testing the control activities as well as the procedures for control activities;
(c)
a data-sampling plan setting out the scope and methods of data sampling relating to data points underlying the fuel and electricity consumption or other relevant information in the FuelEU report and partial FuelEU report.